On Schedule

We’re only about 2 weeks behind schedule so far, which is actually about 2 weeks less behind schedule than I thought we’d be at this point. So we’re actually ahead of schedule.
Work on the taps is going swimmingly. I’ve got 16 tap designs that we’ll be launching at the end of the month. We’ve been testing finishes and getting the process down, faster and faster.
Derek will be doing some big upgrades to the CNC in the next couple of months. We’ll post a video once it’s done. A shopping cart will follow in fall with more products coming in spring (bar stools, pub signs etc).
Here are a couple of new taps freshly engraved on the CNC ready to be cut out and filled with epoxy.

drcut1

krampus_cut

Our latest taps including this one, as well as our bar stools are currently at the GPAG till the end of the month.

davyJones

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s